Central FL Underground Team's Up With SGL Constructors on the .....

Ultimate I-4 Project

Central Florida Underground is currently working on the Ultimate I-4 Project with SGL Constructors. This project had over 70 jack and bore’s, ranging from 18″ to 84″ in diameter. CFU utilized a BMTA “Boring Machine Tunneling Attachment” to complete the larger diameter casings.  This allows us to bore the casing to maintain alignment and to protect the integrity of the roadway.

 

Pictured is CFU boring 84″ .625 Coated OD Casing utilizing a BMTA

Below is a sample of the jack & bore’s completed on this project:

• 24″ .375 Coated OD Casing – 290 L.F.

• 30″ .375 Coated OD Casing – 400 L.F.

• 36″ .375 Coated OD Casing – 286 L.F.

• 42″ .500 Coated OD Casing – 271 L.F.

• 48″ .500 Coated OD Casing – 200 L.F.

• 60″ .625 Coated OD Casing – 300 L.F.

• 72″ .625 Coated OD Casing – 95 L.F.

• 84″ .625 Coated OD Casing – 268 L.F.

Central Florida Underground & Ultimate I-4 Project